• home arrow
  • arrow
icon DESIGN OF FOSSIL & COGENERATION POWER PLANT

THERMAL AND COMBINED CYCLE POWER

As the main business partner of KECPCO.ENC. West Incheon Thermal Power Plant No. 3-4 and
Taean Thermal Power Plant No. 1-8, Boryeong Thermal Power Plant No. 3 to 8, Dangjin Thermal Power Plant No. 3-6,
Uldong Thermal Power Plant, Yeongdong Thermal Power Plant, Malachian Thermal Power Plant and Power Plant.
In addition, the Cogeneration Plant was responsible for design services
such as Anyang Thermal Combined Power Plant and Kumho TDF Combined Power Plant.

PDF Download

Services Period Field Clients Note
765KV PYLON DESIGN 96.01~96.12 STEEL STRUCTUREDESIGN KEPCO Engineering & Construction Company Inc.